Home  /  Phoenix, AZ  /  Guides  /  Do You Need a Licensed Contractor and a Permit for Concrete in Arizona?

Do You Need a Licensed Contractor and a Permit for Concrete in Arizona?

Quick answer

In Arizona, contractors are licensed by the Registrar of Contractors (ROC), and concrete has its own residential classification. The handyman exemption covers only minor work under $1,000 in total that doesn't need a building permit. Driveway aprons, curb cuts and right-of-way work often need a city permit, and HOAs usually require approval. Always contact Arizona 811 before digging.

Last updated

Before you hire someone to pour a driveway, extend a patio or build a casita slab, it helps to know two things: whether the person doing the work needs a state license, and whether the project needs a permit from your city. In the Phoenix metro, the answers are clearer than in many states, but the details still depend on the size of the job and where it touches public property.

Who licenses contractors in Arizona

The Arizona Registrar of Contractors, usually called the ROC, licenses construction contractors statewide. Unlike states where concrete flatwork is largely unregulated, Arizona's contractor law generally requires a license for construction work unless an exemption applies. The ROC issues licenses in residential, commercial and dual classifications. Concrete work for homes falls under a residential concrete classification, which Arizona's administrative rules describe as covering the installation and repair of concrete, concrete products and accessories common to the industry.

There's also a residential hardscaping classification that covers some non-load-bearing concrete, such as uncovered patios and walkways, along with landscape walls and irrigation. Its scope, as described in the state rules, excludes concrete driveways. That's a good example of why it's worth checking that a contractor's license classification actually matches your project.

The handyman exemption

Arizona law has an exemption, often called the handyman exemption, for work that is casual or minor in nature where the total contract price for the whole project, including labor and materials, is less than $1,000. It doesn't apply if the work requires a local building permit, and someone relying on it who advertises must say they are "not a licensed contractor." A project can't be split into smaller pieces to stay under the limit.

In practice, almost any real concrete project, such as a driveway, patio extension or slab for a shed, will cost more than that, so you should expect to hire a licensed contractor.

How to check a license

  • Ask for the contractor's ROC license number and look it up on the ROC website.
  • Check that the license is active and that the classification covers your work.
  • Review any complaint history the ROC shows.
  • Ask for a certificate of insurance as well; a license and insurance are different things.

Hiring a licensed contractor also matters if something goes wrong. The ROC handles complaints against licensed contractors, and Arizona has a recovery fund for some residential projects. The ROC can explain whether and how those apply to your situation.

Permits: it depends on the city and the street

Licensing is a state matter, but permits are local. Phoenix, Scottsdale, Chandler, Gilbert, Mesa, Glendale and Peoria each have their own building and right-of-way rules. Some projects that commonly involve permits:

  • Driveway aprons and curb cuts. The part of a driveway between your property line and the street is usually public right-of-way.
  • Public sidewalks. Replacing a sidewalk panel along the street is right-of-way work.
  • Covered patios and ramadas. Roofed structures generally need building permits.
  • Accessory buildings, casitas and additions. Usually need building permits and inspections, including footing inspections before concrete is placed.

Plain slabs entirely on private property, like a ground-level patio, may or may not need a permit depending on the city and scope. When in doubt, call your city's development services or building department.

A City of Phoenix example

The City of Phoenix publishes a driveway policy for single-family development that shows how detailed these rules can get. On streets with roll or ribbon curb and gutter, a concrete driveway extending up to 10.5 feet into the right-of-way is treated as part of the on-site driveway work, and no separate driveway permit is needed. Longer sections in the right-of-way require a separate driveway permit. On streets without sidewalk, curb or gutter, a driveway permit is required. The policy calls for six-inch concrete for residential driveways in the right-of-way, and finishes other than a rough broom finish, or materials other than concrete and asphalt, on longer sections can require a maintenance agreement with the Street Transportation Department. Rules like these are why it's worth asking your contractor exactly what they'll file.

HOAs

A large share of the Valley's newer homes are in HOA communities, especially in Chandler, Gilbert, north Phoenix, north Peoria and parts of Scottsdale and Mesa. HOA architectural guidelines often cover driveway width and extensions, RV pads and gates, colors and finishes, patio covers and shed placement. HOA approval is separate from a city permit, and you may need both. Submit plans early and get approval in writing.

Scottsdale's desert lands

In northern Scottsdale, the city's Environmentally Sensitive Lands ordinance applies to a large area of desert and mountain land. It requires part of each property to be preserved as natural area open space and protects features such as washes and boulder outcrops. If your lot is in that area, check your plat and with the city before placing new hardscape near any preserved area.

Flood irrigation

Some older neighborhoods in Phoenix, Mesa, Chandler, Gilbert and nearby cities receive flood irrigation from SRP through private neighborhood systems that residents own and maintain. If you're in one of these areas, new slabs, walls and walks shouldn't block the water's path or damage pipes and valves. SRP has staff who can explain what you and your neighbors are responsible for.

Always call 811

Arizona law requires notifying Arizona 811 before digging so underground utilities can be marked, generally at least two working days ahead. Most contractors submit the request themselves, but ask to be sure. Utility marks don't cover private lines, such as irrigation, landscape lighting or a line to a detached garage, so tell the contractor where those run.

A simple checklist

  1. Get the contractor's ROC license number and check it.
  2. Ask for a certificate of insurance.
  3. Ask which permits the project needs and who will pull them.
  4. Get HOA approval in writing if you have an HOA.
  5. Confirm the contractor will contact Arizona 811.
  6. Get a written contract that spells out scope, thickness, base, joints, finish, cleanup and warranty.

When you're ready, request a concrete contractor. You can also read about slabs and foundations or concrete driveways in the Phoenix metro.

Frequently asked questions

Can a handyman pour my patio in Arizona?

Only if the whole project is under $1,000 including labor and materials, is minor in nature and doesn't need a building permit. Most patios cost more than that, so a licensed contractor is generally required.

How do I look up an Arizona contractor's license?

Use the Arizona Registrar of Contractors website to search by license number or business name. Check that the license is active and that the classification covers your type of work.

Do I need both HOA approval and a city permit?

Often, yes. HOA approval and city permits are separate. Your HOA enforces its own guidelines, while the city enforces building and right-of-way rules.

Sources and further reading

Request help now

Get help now