Home  /  Sacramento, CA  /  Guides  /  Got a Sidewalk Repair Notice in Sacramento? What to Know

Got a Sidewalk Repair Notice in Sacramento? What to Know

Quick answer

In the City of Sacramento, the property owner is responsible for repairing the public sidewalk next to their property. If an inspector finds a defect, you'll get a notice with an estimate and three options: hire a licensed contractor, do the work to city specifications, or have the city do it and bill you. Contact the inspector before work starts.

Last updated

Every year, Sacramento homeowners open the mail to find a notice that the sidewalk in front of their house needs repair, often because a street tree's roots have lifted a panel. It can be a surprise, especially if you assumed the city takes care of sidewalks. This guide explains how the City of Sacramento's sidewalk program works, based on the city's published sidewalk maintenance handbook, and what to think about before you hire someone. If you live in another city or an unincorporated part of the county, the basic idea is often similar but the details differ, so check with your local public works department.

Why the owner pays

The City of Sacramento's handbook explains that, as in many communities, the property owner is responsible for maintaining the sidewalk next to their property. It cites the California Streets and Highways Code and the Sacramento City Code as the basis for that responsibility. The reasoning the city gives is that owners benefit most from a well-kept sidewalk. The city has also said this responsibility holds even when a city street tree's roots caused the damage. Curbs and gutters are treated differently from sidewalks, so read your notice to see exactly what it covers.

How a notice happens

The city's inspection program is request-based. An inspector visits when someone reports a problem, such as a neighbor, a passerby or the owner, or when they notice it during other work. The handbook says inspectors generally look at the reported area plus 50 to 75 feet in each direction, or to the corner if that's closer, and note defects at neighboring properties too. That's why several houses on a block sometimes get notices at once.

What counts as a defect

The handbook describes a defective sidewalk as one where the grade is altered or displaced, or another condition interferes with public use. Examples it lists include:

  • Vertical or horizontal displacement of half an inch or more
  • Gaps between panels half an inch wide or more
  • Settlement that makes water pond and creates a slip hazard
  • Excessive cross slope caused by tree roots
  • Chipped or spalled surfaces
  • Sidewalk so far off grade that it's displaced from the curb and gutter

Half an inch doesn't sound like much, but it's enough to catch a toe, a cane or a wheelchair wheel.

The notice and the timeline

When a defect is found, the inspector determines the scope and prepares an estimate. If needed, the city may put in a temporary patch to keep the walk usable. The owner is identified from county tax records and mailed a Sidewalk Repair Notice with the estimate and repair options. According to the handbook, if the owner doesn't respond within 30 days, a second notice gives another 30 days. After that, the city may make the repair and bill the owner. Unpaid bills can become a lien on the property, so don't set the notice aside.

Your three options

  1. Hire a licensed contractor. The handbook says to contact your inspector before work begins, and that your notice serves as your permit.
  2. Do the work yourself. You'll need to follow the city's sidewalk specifications and call the inspector before starting. The notice serves as the permit here too.
  3. Have the city do it. Sign and return the notice selecting this option, and the city's contractor schedules the repair. You're billed after it's done. Check with the city about current payment options.

Comparing the city's estimate to a private quote

The city's estimate gives you a baseline. A private contractor may come in higher or lower depending on how they price small jobs, whether they can group your work with neighbors, and what else you want done. If your driveway approach, front walk or steps also need work, a contractor can often do it all in one mobilization, which can be worth more than a small price difference on the sidewalk. Ask any contractor you're considering:

  • Have you done sidewalk repairs under City of Sacramento notices, and do you work to the city's specifications?
  • Will you contact the inspector and schedule any inspection?
  • What's included: tear-out, disposal, root work, base and the finished panels?
  • What is your CSLB license number, and can I see your insurance?

California requires a CSLB-licensed contractor for any job of $1,000 or more in labor and materials, or any job that needs a permit. Concrete contractors usually hold the C-8 Concrete classification.

Tree roots

Many notices trace back to roots from street trees. Cutting roots can harm a tree or make it unstable. In the City of Sacramento, the city's rules allow root cutting for sidewalk repairs after consultation with the city arborist, and the city generally removes a street tree only as a last resort. Before your contractor cuts any significant root, ask whether the city's urban forestry staff needs to be involved. Solutions can include ramping the new panel slightly, widening the planting strip, or curving the walk, where the city allows it.

Repair methods

  • Grinding a raised edge can remove a small displacement, if the city accepts it for your defect.
  • Lifting a sunken panel with slurry or foam can work when the panel is intact.
  • Replacement from joint to joint is the usual fix for broken, root-heaved or badly tilted panels.

The right method depends on what the inspector flagged and what the city will accept. Confirm with the inspector before work starts, so you don't pay for a repair that doesn't clear the notice.

If you're not in the City of Sacramento

Unincorporated areas like Carmichael, Fair Oaks and Arden-Arcade fall under Sacramento County, whose Department of Transportation issues encroachment permits for work in the county right-of-way. Elk Grove, Citrus Heights, Rancho Cordova, Folsom, Roseville, Rocklin and Davis each have their own public works departments, sidewalk policies and permit processes. Responsibility and process can differ a lot from one city to the next, so call or check your city's website before scheduling work on a public sidewalk.

Don't wait on a trip hazard

Even before a notice arrives, a lifted panel in front of your home is a hazard to neighbors, kids and visitors. Mark it, keep people away from it, and get it looked at. Taking care of it early can also keep a small repair from turning into a bigger one as roots keep growing.

Next steps

  1. Read the notice closely and note the deadline and exactly what's flagged.
  2. Take photos of the damage and the notice.
  3. Decide whether you want other work, such as the driveway approach or front walk, done at the same time.
  4. Get a quote from a licensed contractor and compare it to the city's estimate.
  5. Contact the inspector before any work starts.

Ready to get a quote? Request a sidewalk contractor and include a photo of your notice. For more on the work itself, see our sidewalks and walkways page.

Frequently asked questions

Do I have to pay to fix the sidewalk if the city's tree caused the damage?

In the City of Sacramento, yes. The city has said the adjacent owner is responsible for sidewalk repair even when a city tree's roots caused the damage. Root cutting is coordinated with the city arborist. Other cities have their own policies.

What happens if I ignore a sidewalk repair notice?

According to the city's handbook, a second notice gives another 30 days. After that, the city may do the repair and bill you, and unpaid bills can become a lien on the property.

Do I need a separate permit if I hire my own contractor?

For work under a City of Sacramento repair notice, the handbook says the notice serves as your permit, but you or your contractor must contact the inspector before work begins. Other work in the right-of-way generally needs an encroachment permit.

Sources and further reading

Request help now

Get help now