A durable Dallas-Fort Worth driveway starts with a compacted, uniform subgrade on expansive clay, a proper base, rebar, and control and isolation joints. Driveways are commonly four to five inches thick, with thicker drive approaches in the city right-of-way. Summer pours need early starts and prompt curing, and the approach usually needs a city permit.
Last updated
Concrete is the default driveway material across Dallas-Fort Worth, from older front-entry driveways in Dallas and Fort Worth neighborhoods to the alley-loaded garages common in Plano, Frisco and other suburbs. Here a driveway has to handle vehicle loads, summer heat that can push past 100 degrees, and clay soil that swells after heavy rain and shrinks during drought. A well-built driveway can last for decades. One poured on a thin, poorly compacted base often cracks into offset panels within a few years.
What goes into a durable North Texas driveway
- Tear-out. The old slab is broken out and hauled away. Older driveways may have rebar or wire mesh that adds demolition time.
- Subgrade preparation. Soft or organic soil is removed and the clay is shaped and compacted. On expansive clay, the goal is a uniform, stable subgrade without wet or loose pockets.
- Base. Many contractors place a compacted layer of crushed stone or select fill. Ask what material and depth are included, since this varies from bid to bid.
- Forms and slope. The driveway is formed so water drains toward the street or alley and away from the garage and foundation.
- Reinforcement. Steel rebar on chairs is common on North Texas driveways because it helps hold slab sections together when the clay moves. Reinforcement keeps cracks tight; it doesn't prevent them.
- Placing, finishing and joints. Control joints are tooled or saw-cut at planned spacing, and an isolation joint separates the driveway from the house slab.
- Curing. A curing compound or moist cure keeps the surface from drying too fast, which matters a lot in Texas heat.
Thickness and mix
Residential driveways are commonly poured about four to five inches thick, with more thickness often recommended where trucks, trailers or RVs will park. Many North Texas cities require a thicker section for the drive approach in the right-of-way; Fort Worth's parkway standards, for example, call for a six-inch minimum across the approach. Ask about the concrete mix, strength and whether air entrainment is included for exterior work.
Pouring in Dallas-Fort Worth weather
Hot, dry and windy days make concrete set quickly and lose surface moisture, which can cause plastic shrinkage cracks and a weak, dusty surface. Experienced crews often start at first light in summer, dampen the base, and use evaporation retarders and curing compound. Spring and fall are the wettest seasons in the Metroplex, so rain delays are common then. In winter, fresh concrete has to be protected on freezing nights.
The drive approach and the city
The section between your property line and the street, often called the drive approach, usually sits in the public right-of-way, along with the sidewalk it crosses. Cities across the metro regulate this work. Fort Worth says new or repaired approaches and sidewalks need a parkway permit pulled by a bonded contractor, while flatwork entirely on your own lot does not. Dallas issues paving permits for drive approaches and sidewalks on city property through its permit center. Frisco requires contractors to register and get a right-of-way permit before working in the right-of-way. If your driveway connects to a state highway, TxDOT may also be involved. Rules differ, so ask your contractor who pulls the permit and check with your city.
After the pour
- Stay off new concrete on foot until your contractor says it's ready, and keep vehicles off longer, often a week or more.
- Keep sprinkler heads and downspouts from soaking one edge while the rest of the slab stays dry.
- Avoid salt-based ice melt, especially in the first winter.
- Ask your contractor whether and when to apply a penetrating sealer.
Questions to ask
- How thick will the driveway and the approach be, and what base and reinforcement are included?
- Where will the control and isolation joints go?
- Who handles the city permit, HOA submittal, tear-out and disposal?
- What does the warranty cover, and can you provide a certificate of insurance?
Not sure if you need full replacement? See concrete repair and leveling, or request a driveway contractor and include photos of the existing driveway.
See how it works
Frequently asked questions
Do I need a permit to replace my driveway in Dallas-Fort Worth?
Usually for the drive approach and sidewalk in the right-of-way, and sometimes not for the part on your lot. Fort Worth, for example, says approaches and sidewalks need a parkway permit pulled by a bonded contractor, while flatwork on your own property doesn't. Other cities differ, so check with yours.
How long before I can drive on a new concrete driveway?
Foot traffic is often fine after a day or so, but contractors commonly advise keeping cars off for about a week and heavier vehicles longer. Mix and weather affect timing, so follow your contractor's guidance.
Why do North Texas driveways crack into offset panels?
Expansive clay swells when wet and shrinks when dry, and uneven moisture lets one panel rise or drop relative to the next. A uniform subgrade, rebar, good joints and steady drainage reduce it. Some shrinkage cracking along joints is normal.
Sources and further reading
- Texas Water Development Board: Houston Black, the Texas state soil
- National Weather Service Fort Worth: Dallas/Fort Worth climate narrative
- Texas Department of Licensing and Regulation (TDLR)
- Texas 811: call before you dig
- City of Fort Worth: Residential Permitting
- City of Fort Worth: Parkway standards
- City of Dallas: Development Services forms (paving permits)
- City of Frisco: Right-of-Way
- City of McKinney: Right-of-Way Permits
- City of Plano: Building Permits
- City of Arlington: Do I Need a Permit? A DIY Guide
- North Texas Municipal Water District
- American Concrete Institute (ACI)
- Portland Cement Association (PCA)