A durable concrete driveway in the Seattle area starts with a compacted subgrade and a well-drained gravel base, is commonly about four inches thick (thicker for heavy vehicles), uses an air-entrained mix and has control joints at planned spacing. On steep lots, a textured finish adds traction. The street end usually needs a city right-of-way or curb cut permit.
Last updated
Seattle-area driveways have a hard job. Many climb or drop steeply from the street, they sit wet for much of the year, and they collect runoff from roofs, lawns and the lot above. A driveway built on a well-drained, compacted base can last for decades here. One poured over soft fill, with water trapped underneath, tends to crack, settle at the garage and grow moss in every joint.
What goes into a durable driveway
- Tear-out and excavation. The old concrete or asphalt is removed and the soil is dug down to make room for a base.
- Subgrade preparation. Soft, organic or loosely filled soil is removed and the remaining soil is compacted. Many Puget Sound lots have glacial till near the surface, which is firm but drains very slowly, so water handling matters as much as compaction.
- Gravel base. A compacted layer of crushed rock gives the slab uniform support and a path for water to drain out instead of soaking the subgrade.
- Forms and slope. The surface is shaped so water runs away from the garage and house and toward a safe outlet, not into a neighbor's yard or onto the sidewalk.
- Reinforcement. Rebar, welded wire or fiber-reinforced mixes help hold cracks tight. They don't prevent cracking.
- Placing, finishing and joints. Control joints are tooled or saw-cut at planned spacing so shrinkage cracks form in straight lines.
- Curing. The slab is kept moist or sealed with a curing compound, and protected from rain and cold in its first days.
Steep driveways
Hillside lots are common in Seattle, Bellevue, Kirkland and many other cities around the Sound. On a steep drive, traction matters in the rain and on frosty mornings, so contractors often use a heavier broom texture or exposed aggregate rather than a smooth finish. Steep slopes are also harder to pour and finish, and a pump truck may be needed when a ready-mix truck can't reach the forms safely. If a lot sits on or near a mapped steep slope or landslide-prone area, extra city review can apply to grading and drainage, so check before you plan a wider footprint.
Thickness and mix
Residential driveways are commonly poured about four inches thick, with five inches or more often recommended where heavier vehicles, trucks or RVs park. The Seattle area doesn't freeze often, but freezing nights and the occasional snow and ice event do happen, and many contractors use air-entrained concrete for exterior flatwork for that reason. The Portland Cement Association and American Concrete Institute both explain why entrained air helps concrete resist freeze-thaw damage.
The approach, the curb and the sidewalk
The part of the driveway between your property line and the street usually sits in the public right-of-way. In the City of Seattle, cutting an existing curb for driveway access calls for a curb cut permit, and connecting a driveway to a street without a curb calls for a street use permit; SDOT inspects that work. Bellevue, Redmond, Tacoma and other cities have their own right-of-way permits that cover driveway replacement. Rules and fees vary, so ask your city and confirm who will pull the permit.
After the pour
- Stay off new concrete on foot until your contractor says it's ready, and keep vehicles off longer, often a week or more.
- Avoid deicing salt on new concrete during its first winter; sand gives traction without the surface damage.
- Keep downspouts and runoff from undercutting the edges.
- Ask about a penetrating sealer to slow water absorption, and when it can go on.
Questions to ask
- How thick will the slab be, and what base, drainage and reinforcement are included?
- Where will the control joints go, and what finish will give traction on our slope?
- Who handles right-of-way permits, tear-out and disposal of the old driveway?
- Are you registered with Washington L&I, and can you provide a certificate of insurance?
When you're ready, request a driveway contractor and include photos of the existing driveway and the street end.
See how it works
Frequently asked questions
How long before I can drive on a new concrete driveway?
Foot traffic is often fine after a day or so, but contractors commonly advise keeping cars off for about a week and heavier vehicles longer. Cool, damp weather slows curing, so follow your contractor's guidance.
Do I need a permit to replace my driveway in Seattle?
If the work touches the curb, sidewalk or street, usually yes. In the City of Seattle, removing curb for driveway access calls for a curb cut permit, and connecting to a street without a curb calls for a street use permit. Other cities have their own right-of-way permits, so check with yours.
What finish is best for a steep driveway?
A heavier broom finish or exposed aggregate gives better traction in rain and frost than a smooth finish. Avoid glossy sealers on steep drives, and make sure water is directed off the surface instead of running its full length.
Sources and further reading
- Washington State Department of Labor & Industries: Register as a contractor
- Washington Utilities and Transportation Commission: Call before you dig
- Seattle Department of Transportation: Property owners' responsibilities
- Streets Illustrated (Seattle right-of-way manual): Construction permits
- Seattle Department of Construction and Inspections: Environmentally Critical Areas code
- Seattle Public Utilities
- City of Bellevue: Right-of-way permits
- City of Redmond: Right-of-way use permit
- City of Tacoma: Sidewalks
- City of Renton Municipal Code: Critical areas regulations
- Washington State University Extension
- USDA NRCS Web Soil Survey
- American Concrete Institute (ACI)
- Portland Cement Association (PCA)